Ambiguous tender documents are one of the most common causes of avoidable problems in construction and fit out projects.
They don’t usually cause immediate disruption. The tender is issued, prices are returned, a contractor is appointed and the project moves forward. On the surface, everything appears fine.
In reality, the risk has already been baked in.
Incomplete specifications, conflicting drawings and vaguely defined scope force contractors to make assumptions. Those assumptions don’t disappear. They show up later as cost, delay or dispute.

Why Ambiguous Tenders Create Risk
Most project teams are aware when tender information isn’t quite there yet. Programmes are tight. Information is still developing. There’s pressure to get something out to market.
The problem is that once clarity is missing, contractors have no choice but to interpret.
That usually results in one of three things:
- Risk allowances added to protect against unknowns
- Items unintentionally missed
- Prices that vary significantly because each bidder has priced a different version of the job
Instead of comparing like for like, project teams are left trying to decode assumptions. Clarification questions increase, tender reviews take longer and confidence in the outcome drops.

What Happens When Ambiguity Makes It to Site
If issues aren’t resolved at tender stage, they don’t go away.
They resurface during construction as variations, claims and programme pressure. Contingency gets used defensively. Conversations become contractual rather than collaborative.
By then, relationships are already under strain – and all of it was predictable from the quality of the original documents.
How C&S Bring Clarity at Tender Stage
At C&S, we regularly receive tender packs that are incomplete or inconsistent. That’s not unusual, particularly on office fit outs and refurbishments.
We don’t treat that as an excuse to price defensively. We treat it as something that needs fixing.
Our approach is simple and structured:
- We interrogate the tender pack line by line
- We raise targeted clarification questions focused on defining scope
- Where information is missing, we propose practical options and price them transparently
Rather than hiding risk inside a lump sum, we make it visible.

Better Tender Returns Support Better Decisions
A good tender return should do more than provide a headline figure.
It should clearly state what is included, and what isn’t, where assumptions have been made and where the documents need tightening before award.
That makes reviews faster, decisions clearer and projects far more likely to run smoothly.
If you know your tender documents aren’t perfect, that doesn’t mean the process is compromised. We can still help you secure a robust, decision-ready tender return that protects the programme, budget and relationships – get in touch today.
Get in touch to discuss your next fit out project
Read about the benefits of working with a smaller main contractor